It takes a gardener 45 minutes to dig a flower bed of area 7.5m square. if he digs at the same rate, how long does he take to dig 9m square?
Answers
Answered by
2
Answer:
54m
Step-by-step explanation:
Time taken by gardener to dig a 7.5 m^2 flower bed = 45 minutes
.: Let the time taken to complete 9m^2 flower bed be x.
.: 45 minutes = 7.5m^2
x = 9m^2
By cross multiplication
45×9 = x
7.5
.: x = 54
Therefore it takes 54 minutes for the gardener to dig a flower bed of 9m^2.
Similar questions