कॉस्ट ऑफ डिजाइंस ए वेल आफ्टर एवरी मीटर ऑफ डिजाइन व्हेन इट कॉस्ट 150 फॉर द फर्स्ट मीटर एंड राइज बाय कॉस 250 फॉर इट्स सर्विस क्यूट्स मीटर
Answers
Answered by
1
Answer:
Here , the cost of digging for 1st metre = Rs. 150
The cost of digging for first 2 metres = Rs. 150 + 250 = Rs. 400
The cost of digging for first 3 metres = Rs. 150 + (Rs. 250) × 2 = Rs. 650
The cost of digging for first 4 metres = Rs. 150 + (Rs. 250) × 3 = Rs. 900
∴ The terms are: 150, 400, 650, 900, ...
Since, 400 – 150 = 250
And 650 – 400 = 250
⇒ (400 – 150) = (650 – 400)
∴ The above terms form an A.P.