Lead is the average horizontal straight distance between the borrow pit and the place of spreading soil?

Answers

Answered by Vamprixussa
0

⊕ANSWER⊕

  • Now, the average horizontal distance between borrow pit and the construction site is called “lead”.
  • The average vertical distance between borrow pit and the construction site is called “lift”.