Lead is the average horizontal straight distance between the borrow pit and the place of spreading soil?
Answers
Answered by
0
⊕ANSWER⊕
- Now, the average horizontal distance between borrow pit and the construction site is called “lead”.
- The average vertical distance between borrow pit and the construction site is called “lift”.