Leakage through the transverse joints in a gravity dam is prevented by
Answers
Answered by
0
Making sure that every connection is fitted well.
Have a great day ahead mate ❤️
Answered by
0
Answer:
Explanation: Water bars or water stops are provided in the transverse as well as horizontal joints in concrete adjacent to the upstream face of the dam. The openings of the joints are sealed properly with water stops to avoid passage of seepage of water through the body.
Similar questions