Physics, asked by sairaelsa3199, 1 year ago

M40 concrete is preferred to m20 concrete for prestressed concrete to

Answers

Answered by Riteshjena121
0
Case 1) Take 20 bars, give a strain of 0.1 ... 
Force = Stress * Area
 = E * Strain * Area
 = 100 kN/mm2 * 0.1 * 1 mm2
 = 10 kN
Total force = 200 kN (for 20 bars)

Case 2) Take 1 prestressing cable, give a strain of 2 ... 
Force = E * Strain * Area
 = 100 kN/mm2 * 2 * 1 mm2
 = 200 kN