Physics, asked by jcsprani123, 11 months ago

man of 55 kgs is holding a bucket of mass 25 kg he walks 50 meters on a level road at a constant speed of 3 metre per second and then climbs up a hill of height 20m the work done by the man is​

Answers

Answered by a1s2d3f4g5h6j7h8k9l9
1

Answer:

Explanation:

ttal weight is 55+25=80

he c0ver 50m in=50/3= 16.666 sec

f0r 20m =20/3=6.66 sec

t0tal time  he w0rked =16.66+6.66=23.32

Answered by barbiegirl15381
3

Answer:

Your answer mate is posted above.

Attachments:
Similar questions