Math, asked by pickit, 4 months ago

Mark digs a trench along the boundary of a square field of perimeter 200 m. If he charges ₹100 for digging every meter of the trench's length, how much does he earn by digging the trench?

The cost of digging the trench =200× ₹100

Answers

Answered by BrainlyArnab
8

Answer:

He earn by digging the trench =

₹20,000

Step-by-step explanation:

given -

perimeter of field = 200 m

rate of digging = 100 / metre

to find -

total cost of digging

solution -

cost of digging 1 m = 100

cost of digging 200 m = 100×200

= 20000

hope it helps.

Answered by ruvanesh6cvel
0

Answer:

20000

Step-by-step explanation:

Similar questions