Mark digs a trench along the boundary of a square field of perimeter 200 m. If he charges ₹100 for digging every meter of the trench's length, how much does he earn by digging the trench?
The cost of digging the trench =200× ₹100
Answers
Answered by
8
Answer:
He earn by digging the trench =
₹20,000
Step-by-step explanation:
given -
perimeter of field = 200 m
rate of digging = ₹100 / metre
to find -
total cost of digging
solution -
cost of digging 1 m = ₹100
cost of digging 200 m = ₹100×200
= ₹20000
hope it helps.
Answered by
0
Answer:
20000
Step-by-step explanation:
Similar questions