Mark is making concrete.
Concrete is made by mixing cement, sand and gravel in the ratio 1:2:3.
Mark wants to make 300kg of concrete.
(a) How much cement does Mark need?
(b) How much sand does Mark need?
(c) How much gravel does Mark need?
Answers
Answered by
10
1st value = 1st terms / sum of terms * total
so, cement needed = 1 / 1+2+3 *300
= 1/6 *300
= 50kgs
2nd value = 2nd term /sum of terms * total
so, sand needed = 2 / 1+2+3 *300
= 2 / 6 *300
= 100kgs
now gravel needed is easy, 300 - (50+100) = 150