Mention any four limitation harnessing wind energy on a large scale
appu741:
Hi
Answers
Answered by
142
It needs a lot of area for set up
It need high level of maintenance
It can Only be sed up in places with wind speed 15km per hour
It can only be set up in hilly terrain
It need high level of maintenance
It can Only be sed up in places with wind speed 15km per hour
It can only be set up in hilly terrain
Answered by
47
--- > wind energy farms can be established only at those places where wind blows for the greater part of the year (i.e. more than 15 km/h)
---> it requires a large area of land (i.e. 1MW requires about 2 hectares of land)
---> initial cost of establishment of wind energy farms is quite high
--> the blades are exposed to vagaries of nature like rain , sun, strom, they need a high level of maintenance
--------- by -----> Ramkan