Physics, asked by mayankfen89, 1 year ago

Mention any four limitations in harnessing wind energy on a large scale.​

Answers

Answered by poojachoudhary09
4

Answer:

your answer is here !

Explanation:

(i) Continuous blowing of air is required to develop wind energy farms

(ii) Wind speed should be higher than 15 km/h to maintain the speed of the turbine.

(iii) Back-up facilities have is important during a period when there is no wind.

(iv) For preparing 1 MW generator wind farm we need about 2 hectares of land.

follow me !

Answered by Anonymous
2

  1. It needs a lot of area for set up

  1. It need high level of maintenance
  2. It can Only be sed up in places with wind speed 15km per hour
  3. It can only be set up in hilly terrain

Similar questions