Mention any four limitations in harnessing wind energy on a large scale.
Answers
Answered by
4
Answer:
your answer is here !
Explanation:
(i) Continuous blowing of air is required to develop wind energy farms
(ii) Wind speed should be higher than 15 km/h to maintain the speed of the turbine.
(iii) Back-up facilities have is important during a period when there is no wind.
(iv) For preparing 1 MW generator wind farm we need about 2 hectares of land.
follow me !
Answered by
2
- It needs a lot of area for set up
- It need high level of maintenance
- It can Only be sed up in places with wind speed 15km per hour
- It can only be set up in hilly terrain
Similar questions