mention any four limitations in harnessing wind energy on a large scale.
Answers
Answered by
3
It needs a lot of area for set up
It need high level of maintenance
It can Only be sed up in places with wind speed 15km per hour
It can only be set up in hilly terrain
hope you got ur answer
It need high level of maintenance
It can Only be sed up in places with wind speed 15km per hour
It can only be set up in hilly terrain
hope you got ur answer
Answered by
2
Limitation of harnessing wind energy at a large scale are as following:
1.The maximum speed of wind for harnessing wind energy should be 15km/h
2.For installing a wind energy farm of 1Megawatt capacity we need 2 hectares of land.
3.The energy supply is not constant. We need backup devices such as a generator.
4.Installation and maintanence cost of a wind energy farm is very high
Similar questions