Science, asked by Tejasd0709, 1 year ago

mention any three limitations in harnessing wind energy on a large scale

Answers

Answered by rahulgupta100008
5
the speed of wind must be 15 km /h or more 

for setuping the wind energy farm , it requries the very large scale land 

the wind energy farm should be hilly areas

the speed of wind  15 km /h or more . which is not present every time 
Answered by rohitdhaka172
0
(i) It can be used only at those places where wind blows for the greater part of the year. 

(ii) Wind speed should be higher than 15 km/h to rotate the turbine at the required speed. 

(iii) Need of a back up facility when there is no wind. 