the speed of wind must be 15 km /h or more
for setuping the wind energy farm , it requries the very large scale land
the wind energy farm should be hilly areas
the speed of wind 15 km /h or more . which is not present every time
for setuping the wind energy farm , it requries the very large scale land
the wind energy farm should be hilly areas
the speed of wind 15 km /h or more . which is not present every time
Answered by
0
(i) It can be used only at those places where wind blows for the greater part of the year.
(ii) Wind speed should be higher than 15 km/h to rotate the turbine at the required speed.
(iii) Need of a back up facility when there is no wind.
(ii) Wind speed should be higher than 15 km/h to rotate the turbine at the required speed.
(iii) Need of a back up facility when there is no wind.