Neeraj can do a piece of work in 10 days , Aman can do the same work in 12 days. Neeraj, Aman and Virat together finish the same work in 4 days. In how many days will Virat complete the work alone?
Answers
Answered by
1
Neeraj work = 1 / 10
Aman work = 1 / 12
Neeraj + Aman work = 1 / 10 + 1 / 12
= 6 / 60 + 5 / 60 = 11 / 60
let Virat work be x
All work = 11 / 60 + x = 4
Take LCM
11 + 60x = 4 × 60
60 x = 240 - 11
x = 229 / 60