Science, asked by anoushi1743, 1 year ago

Non-loading heat run test on transformers is performed by means of-
1 sc test
2 oc test
3 half time on sc and half time on oc
4 sumpner's test

Answers

Answered by sangeeta84
0
1) SC TEST:- Short-circuit test

The purpose of a short-circuit test is to determine the series branch parameters of the equivalent circuit of a real transformer.

2) OC TEST:- Open-circuit test

The open-circuit test, or "no-load test", is one of the methods used in electrical engineering to determine the no-load impedance in the excitation branch of a transformer.

4) SUMPNER's TEST:-

Sumpner's test or back to back test on transformer is another method for determining transformer efficiency, voltage regulation and heating under loaded conditions.
Answered by manglam1899
0

this help more I think

Attachments: