English, asked by sangsangeetha584, 10 months ago

nuts per
Afactory produces nuts and bolts. A machine in it produces only nuts while
another produces only bolts. The machine producing only nuts produces 500
minute and need to be cleared for 10 minutes after production of 2000
nuts. The machine producing only bolts produces 600 bolts per minute and
needs to be cleared for 15 minutes after production of 3000 bolts. Find the
minimum time required to produce 6000 pairs of bolts and nuts if both
machines are operated simultaneously.​

Answers

Answered by prince1296
1

Answer:

bro search from google

Similar questions