Math, asked by ElloraPride, 1 month ago

One side of a square plot is 250m. find the cost of levelling it at the rate of Rs 2 per metre

Answers

Answered by TwilightShine
7

Answer :-

  • The cost of leveling the square plot is Rs 125000.

Given :-

  • One side of a square plot is 250 m.

To find :-

  • The cost of leveling it at the rate of Rs 2 per metre.

Step-by-step explanation :-

  • Here, it has been given that the side of a square plot is 250 m. We have to find the cost of leveling it at the rate of Rs 2 per metre square. For this, we are going to find the area of the plot because we are asked to level it. So let's use the formula required for finding the area of a square!

We know that :-

 \underline{\boxed{\sf Area \: of \: a \: square = Side \times Side}}

Here,

  • Side = 250 m.

Hence,

 \rm Area \: of \: the \: plot = 250 \times 250

 \overline{\boxed{\rm Area \: of \: the \: plot = 62500\: m^2}}

Now,

  • The cost of leveling is Rs 2 per metre.

Hence,

  • The cost of leveling the plot is :-

 \boxed{\bf 62500 \times 2 = Rs \: 125000}

-----------------------------------------------------------

Know more :-

What is a square?

  • A square is a quadrilateral which has four equal sides and four equal angles measuring 90° each.

Some formulae :-

  • Perimeter of a square = 4 × Side.

  • Area of a rectangle = Length × Breadth.

  • Perimeter of a rectangle = 2 (Length + Breadth)

Answered by MissVirius
56

Answer ❣️-------

Your answer in attachment

Attachments:
Similar questions