Person A can complete job in 48min while B can complete the same job in 60min .how long will they take to complete the job toghether?
Answers
Answered by
0
Answer:
Step-by-step explaination:-
Let the total work be denoted by 1
If in 48 mins A can do 1,
Then in 1min A can do 1/48,
If in 60 mins B can do 1,
Then in 1min B can do 1/60,
In 1 min A+B can do = (1/48 + 1/60)
=(5+4/240)
=9/240
=3/80
3/80 part is done by(A+B) in = 1min
1 is done by (A+B) in = 1*80/3 min
=26 2/3 mins
i.e. =26.67 mins(approx.)
Hope it is helpful to you....