phase AC circuit with unity power factor.
b) List out the required tools, Instrument raw material with specification also write
step to perform the above parameter measurement in single phase AC Circuit.
c) Connect the meters with load and measure the power and energy directly in sin
AC circuit.
2. a) Draw the schematic connection diagram using BIS symbol and test twin tobe light fitting
bat
by List out the required tools component, material with specification and write the p
perform the above assemble of Twin Tube Light fitting.
c) Assemble and connect the component for Twin Tube Light fitting parallel and test for its
3. a) Draw the circuit diagram to verify the relation between current and voltage when
is constant variable.
bi List out the required tools, instruments and Raw material with Specification.
c) To verify the relation between current and voltage when Resistance is constant
Answers
Answered by
1
Answer:
b
Explanation:
List out the required tools, Instrument raw material with specification also write
step to perform the above parameter measurement in single phase AC Circuit.
Similar questions