Please find the answer for the given details
Load = 1000W
UPS Input = 24V
Required Runtime = 1.5 hours
UPS Efficiency/Power Factor = 70% or 0.7
Battery type is = Lead-Acid (So runtime factor of 1.5)
what should be the battery bank capacity?
Answers
Answered by
1
Hi check your answer here
Given
P=1000w
V=24v
To calculate Load for 1 hour
Load Current for 1 hour = (Runtime Factor x Load) / (UPS Efficiency x UPS Input)
= 1.5 x 1000/ (0.7*24) = 89.29A
To Calculate required Ah for 1.5 hours
Load Current for 1.5 hours
= Answer x 1.5
= 89.29 x 1.5
= 133.94Ah
Now that we know our current usage for 1.5 hours, We need battery size of 133.94Ah.
The nearest round number is 134Ah.