let , A & B together take x days
A will take (x+9) days
B will take (x+4) days
then,
1/(x+9) + 1/(x+4) = 1/x
or, (2x+13)/(x²+13x+36) = 1/x
or, x(2x+13) = (x²+13x+36)
or, 2x²+13x = x²+13x +36
or, x²= 36
or, x= 6 ( no of days are always positive so we neglect -6)
the answer is 6