Math, asked by rohitsinghyou, 4 months ago

plz ans this ques fast plzzzzzzzz.....
and get 20 pt...
plzz no jokes only correct ans...​

Attachments:

Answers

Answered by Zerina313121
3

_____________________

Attachments:
Answered by tanishapaul1340
0

Answer:

Let x be the number of men required to dig a trench of 27 meter.

Number of men 11 x

Length ( in m ) 6

4

3

=

4

27

27

Since, the length of the trench and the number of men are in direct variation, we have:

⇒ 11/x = 27/4/27

⇒ 11×27=x× 27/4

⇒ x= 11×27×4/27

⇒ x=44

∴ 44 men will be required to dig a trench of 27 meter.

Similar questions