Answer:

Let a and b be the work that can be done per day by A & B respectively .

a = 1/8.

Therefore

(24/5) [ (1/8) + b] = 1

[ (1/8) + b] = 5/24

[ (3/24 + b] = 5/24

b = 2/24 = 1/12

B takes 12 days to complete the work.