prepare prepare a project report on various types of mineral in India item include in projects are sheet, acknowledgement, introduction, content
Answers
Explanation:
Content of the Project should be handwritten
The project should be handwritten and not typed and printed.
Neat and legible Handwriting
Handwriting should be legible and no scribbling or cutting should be there. Make a very neat presentation of your project.
Project To Be Presented In Folder
The project should be presented in a neat folder or Spiral Bound.
File Format
Complete project should be in a file format.
Paper
The entire report must be submitted on A4 size paper. Use interleaf coloured sheet (ruled on one side and blank on other side)
Write On One Side Of The Page
The project should be written on one side of each page only.
Margins
You should leave some margin on the Top, bottom, Left and right of the page.
Page Numbers
Every page must be numbered.
Tables And Figures
Tables and Figures should be centred and labelled with identification number and title.Table and figure should clearly show what is intended of them.In case of graphical representation, axis must be clearly labeled.
Sequence Of Project Report
Cover page should contain the Project title, student information, school and year
Acknowledgement
Certificate
List of contents
Introduction, Topic with suitable heading
Planning and activities done during the project, if any
Observations and findings while conducting the project
Newspaper clippings (If Any)
Conclusions (summarised suggestions or findings, future scope of study)
Bibliography
Teachers Observation and Remarks