Computer Science, asked by pratibhasingh0829, 6 months ago

Q1: System Timing
• A program consists of 5,000 floating-point instructions and 25,000 integer instructions. Processor A has a clock rate
2.0 GHz. Floating point instructions take 7 cycles and integer instructions take 1 cycle. How long does it take this
processor to run the program?
N
Processor A runs program 2 consisting of 100,000 floating-point instructions and 50,000 integer instructions. What is
the average CPI for this program?
• Processor B has an average CPI for program2 of 3.5, its clock rate is 1.8 GHZ. How much time does it take to execute
the program?
• Which processor is faster and how much?​

Answers

Answered by stringersingh01
0

Answer:

sorry am not answer very very sorry

Similar questions