Math, asked by chandan2018kumar, 7 months ago

Q11. The total work capacity of A and B is 3 times that of C. The total efficiency of B and C is four times that of A, A, B, C all work together and finish the work in 6 days. Take
out A, B, C​

Answers

Answered by jdaksh488
4

Answer:

A=. .83 day

B= 3.67 Day

C= 1.5 DAY

Step-by-step explanation:

A+B = 3C. equation 1

B+C = 4A. equation 2

A+B+C = 6 day. equation 3

form eq1 and eq3

3C+C =6

4C = 6

C = 6/4

C =1.5 DAY. equation 4

form equation 4 in 1

A+B =3(1.5)

A+B = 4.5

B = 4.5 - A. EQUATION5

PUT EQ 5 IN EQ 2

4.5-A + 1.5 = 4A

6 = 5A

A = 5/6 =0.83

PUT IN EQ 3

0.83 + B + 1.5 = 6

B = 6-0.83+1.5

B = 3.67 days

Similar questions