Q13 . A and B can do a job in 6 days , B and C in 9 days , A and C in 12 days . How much time will take to complete the job if they all work together ? How long will each of them take to do the job?
Answers
Answered by
1
Answer:
The average between 6 and 12 is 9 so if they work together the average should be 9
Step-by-step explanation:
B. works 2.5 times faster then A and
A.