Q3. 13 men can dig 117 m long trench 1 point
in one day. How many men should be
employed for digging 225 m long
trench in one day? It is a case of :*
Direct Proportion
Inverse Proportion
Answers
Answered by
1
Step-by-step explanation:
Let x be the number of men required to dig a trench of 27 meter.
Number of men11 x Length ( in m ) 643=42727Since, the length of the trench and the number of men are in direct variation, we have:
⇒ x11=2727/4
⇒ 11×27=x×427
⇒ x=2711×27×4
⇒ x=44
∴ 44 men will be required to dig a trench of 27meter.