Math, asked by atarsingh001973, 3 months ago

Q4. A can do a piece of work in 10
days while B can do the same work in
8 days if they work together how
much time will they take to complete
the work? *​

Answers

Answered by Itznunurbusiness
1

Answer:

A can do a piece of work in 10 days and B can do it 15 days. If both of them are working together, half of the work can be finished in?

LCM of 10 and 15 is 30.

A can do (1/10th) of the work in one day (or 3/30th).

B can do (1/15th) of the work in one day (or 2/30th).

Working together, A and B can do (3/30)+(2/30) = 5/30th of the work in one day. So they would require 30/5 or 6 days to complete the task. Therefore in 3 days A and B together would have done half of the entire work.

Answered by bablidas1975
0

Answer:

A can do a piece of work in 10 days and B can do it 15 days. If both of them are working together, half of the work can be finished in?

LCM of 10 and 15 is 30.

A can do (1/10th) of the work in one day (or 3/30th).

B can do (1/15th) of the work in one day (or 2/30th).

Working together, A and B can do (3/30)+(2/30) = 5/30th of the work in one day. So they would require 30/5 or 6 days to complete the task. Therefore in 3 days A and B together would have done half of the entire work.