Question
The output of a production line is checked by an inspector for one or more of the three different types of defects: A, B and C. If defect A occurs, the item is scrapped. If defect B or C occurs, the item must be reworked. The time required to rework a B defect is 15 minutes and the time required to rework a C defect is 30 minutes. The probability of an A, B and C defect are 0.15, 0.20 and 0.10 respectively. For 20 items coming off the assembly line, determine, using Monte Carlo simulation, the number of items without any defects, the number of items scrapped and the total rework time.
Using the following sets of random numbers:
Defect A Defect B Defect C
48 47 82
55 36 95
91 57 18
40 04 96
93 79 20
01 18 08
83 10 56
63 13 11
47 57 52
52 09 03
82 48 47
95 55 36
18 91 57
96 40 04
20 93 79
08 01 18
56 83 10
11 63 13
52 47 57
03 52 09
Answers
Answered by
0
Answer:
your question is very big so I can't understand this question fully
Explanation:
I am really sorry because I am not sure about my answer
Similar questions