Quiz i Seved Calculate the fakt time for a system where the total time per shift is 480 minutes, there is one shift, and workers are given two 10-minute breaks and 40 minutes for lunch. Daily demand is 270 units. (Round the final answer to 2 decimal places.) Takt time minutes per unit
Answers
Answered by
0
Answer:
1.56 is the answer