Raghav has a field of measure 50m, 65m and 65m. He wants to remove the
grass and tile the field to make a temple. The cost of removing the grass is
Rs7 per sq. m and the cost of tiling is Rs. 25 per sq m.
Find the total cost paid by him to remove the grass and tiling the field.
Answers
Answered by
5
Answer:
Rs. 48000
Step-by-step explanation:
Area of the triangular field = 1500m²
Total cost of removing grass and tilling the field
= (1500*7) + (1500*25)
= 10500 + 37500
= 48000
Answered by
1
Answer:
answer is 48000