Math, asked by indrani394, 9 months ago

Rahul can do one fifth of a work in 2 days and Vishal can do two third of IT in eight days. In how much time can they together complete the work?​

Answers

Answered by Anonymous
2

Answer:

Step-by-step explanation:A’s rate is (1/3)/5 = 1/15 and B’s rate is (2/5)/10 = 2/50 = 1/25.

Their combined rate is 1/15 + 1/25 = 5/75 + 3/75 = 8/75.

Thus, the time it takes the two machines to complete the job is 1/(8/75) = 75/8 = 9 3/8 days.

Answered by shuhbam88mishra
2

Answer:

whatsaaap me yrr 8874409856