Ran can do piece of work in 8 days.he worked for 6 days and left.if hari finish as the reamining work how much work is done by hari
?
Answers
Answered by
4
Answer:
Step-by-step explanation:
Let the total work be 1
Work done by Ram in one day = 1/8
Work done by Ram in six days = 6/8 = 3/4
Remaining work = 1-3/4 = 1/4
Work done by Hari = 1/4 of total work.