rate of 38 per sq m?
(6) How many slabs of cement are required to tile a platform of length 8 m and
breadth 6 m, if the length of each slab is 4 cm and breadth 3 cm?
of nainting a sauare board of side 44 cm at the rate of 7 per sq cm
Answers
Answered by
1
Step-by-step explanation:
no. of slabs= ar. of platform =L×B
ar. of 1 slab l×b
=> 8×6 = 4
4×3
cost of painting= ar(square) ×rate of 1 sq. cm
= (44×44) × 7
=1936×7
=13552 Rs.