Read the following passage and fill in the blanks with the appropriate from of the word given in bracket. (1). after completion of the bridge ,metre- gauge lines..........(lay) from mandapam up to pamban station. (2). from here the railway line bifurcated, one line towards Rameswaram about 6.25 miles (10.06km) up and another brach line of 15 miles (24km) terminating at dhanushkodi. the section..........(open) to traffic in 1914. (3). the railway bridge historically carried metre guage trains, but Indian railways upgraded the bridge to carry bord gauge trains as part of project uniguage, work that.........(complete) on 12 August 2007. (4). until recently , the to leaves of the bridge............(open) manually using levers by workers. Around 10 ships- cargo carriers, coast guard ships, Fishing vessels and oil tankers - pass through the bridge every month. more work was carried out on the bridge in 2009 to strengthen it to enable it to carry goods trains
Answers
Answered by
0
Answer:
1.laid
2. was opened
3. was completed
4.were opened
Explanation:
Hope it helps
Similar questions