Read the passage carefully and answer the following questions:
Kiara is a fashion designer. She got a project to make some outfits for the dancer for
an “Kids Dance Event”. She needs 2 12 m of fabric for the shawl and 1 43 m of fabric for the dress. Per metre cost of fabric is Rs.240.
Answers
Answered by
0
Answer:
Rs. 852 (if I got it right)
Step-by-step explanation:
Per metre cost = 240
Fabric for shawl in metre = 2.12
Cost of total fabric required for a shawl = 240 x 2.12
= Rs. 508.8
Per metre cost = 240
Fabric for dress in metre = 1.43
Cost of total fabric required for a dress = 240 x 1.43
= Rs. 343.2
Cost of total fabric required for a shawl = Rs. 508.8
Cost of total fabric required for a dress = Rs. 343.2
Total Cost = 508.8 + 343.2
= 852
Similar questions