Math, asked by kush723, 1 month ago

Read the passage carefully and answer the following questions:
Kiara is a fashion designer. She got a project to make some outfits for the dancer for
an “Kids Dance Event”. She needs 2 12 m of fabric for the shawl and 1 43 m of fabric for the dress. Per metre cost of fabric is Rs.240.

Answers

Answered by ambekarjiya
0

Answer:

Rs. 852 (if I got it right)

Step-by-step explanation:

Per metre cost = 240

Fabric for shawl in metre = 2.12

Cost of total fabric required for a shawl = 240 x 2.12

= Rs. 508.8

Per metre cost = 240

Fabric for dress in metre = 1.43

Cost of total fabric required for a dress = 240 x 1.43

= Rs. 343.2

Cost of total fabric required for a shawl = Rs. 508.8

Cost of total fabric required for a dress = Rs. 343.2

Total Cost = 508.8 + 343.2

= 852

Similar questions