Reshma can do 75% job in 45 days. In how many days can she complete the job?
Answers
Answered by
1
Answer:
hi
your answer is here !
Step-by-step explanation:
Every work is 100% in itself.
Reshma does 75% of the work in 45 days.
That means she does 1% of the work in 45/75 days and she will do 100% of the work in 100 × 45/75 = 60 days.
Answered by
1
Answer:
75% =45
100% =(?)
=45×100/75
=45×4/3
=180/3
=60 DAYS