sand is falling on conveyor belt at the rate of 10kgs-1 the extra power req
hfhggguired to move the belt velocity 4m/s
Answers
Answered by
2
F= rate of change of mass × velocity change
Now,
Power = work done per second
P = force * rate of displacement