six worker can plaster the exterior of a building in 5 hour if the job is to be completed in only 3 hours 45 minutes how many worker will be needed
Answers
Answered by
13
Answer:
workers = 8
Step-by-step explanation:
6 workers take 5hrs to finish a wall plaster.
work done by them in 1hr = 1/5 = 1/300 converting to mins
now n workers take 3hr45min ro complete the same wall plaster. Converting above time in hrs:
3 + 45/60 = 3.75hrs.
Work done in 1hr = 1/3.75 = 225mins
6 = 1/300
n = 1/225
n = 6x300/225 = 8