sketching from nature and surroundings (sketching landscape incorporating ren and non ren resources of solar energy of telangana
Answers
Answer:
There were two main systems of indigo cultivation – nij and ryoti. Within the system of nij cultivation, the planter produced indigo in lands that he directly controlled. He either bought the land or rented it from other zamindars and produced indigo by directly employing hired labourersThere were two main systems of indigo cultivation – nij and ryoti. Within the system of nij cultivation, the planter produced indigo in lands that he directly controlled. He either bought the land or rented it from other zamindars and produced indigo by directly employing hired labourersThere were two main systems of indigo cultivation – nij and ryoti. Within the system of nij cultivation, the planter produced indigo in lands that he directly controlled. He either bought the land or rented it from other zamindars and produced indigo by directly employing hired labourers
Solar Power Plant Telangana II in state of Telangana, India
India is one of the countries with large production of energy from renewable sources. As of 27 November 2020, 38% of India's installed electricity generation capacity is from renewable sources (136 GW out of 373 GW).
In the Paris Agreement India has committed to an Intended Nationally Determined Contributions target of achieving 40% of its total electricity generation from non-fossil fuel sources by 2030.[1][2] The country is aiming for even more ambitious target of 57% of the total electricity capacity from renewable sources by 2027 in Central Electricity Authority's strategy blueprint.[3] According to 2027 blueprint, India aims to have 275 GW from renewable energy, 72 GW of hydroelectricity, 15 GW of nuclear energy and nearly 100 GW from “other zero emission” sources.[4][3]
Government of India has also set a target for installation of Rooftop Solar Projects(RTP) of 40 GW by 2022 including installation on rooftop of houses.
As of September 2020, 89.22 GW is already operational, projects of 48.21 GW are at various stages of implementation and projects of 25.64 GW capacity are under various stages of bidding.
India was the first country in the world to set up a ministry of non-conventional energy resources (Ministry of New and Renewable Energy (MNRE)), in the early 1980s, and its public sector undertakings the Solar Energy Corporation of India is responsible for the development of solar energy industry in India. Hydroelectricity is administered separately by the Ministry of Power and not included in MNRE targets.
India has a strong manufacturing base in wind power with 20 manufactures of 53 different wind turbine models of international quality up to 3 MW in size with exports to Europe, the United States and other countries.[5] Wind or Solar PV paired with four-hour battery storage systems is already cost-competitive, without subsidy, as a source of dispatchable generation compared with new coal and new gas plants in India.[6]
please follow me
mark as brainlist answer please