SUCCESSFUL
Chemistry Project
Causes of flood in Raiganj West Bengal
Content
pagens.
Acknowledgement
1) Introduction
2) Importance
3) Paternost Aims andbljectives
4) Data collection
5)
analysis
6) Conchsion
7) Reference
Project between 15-20 page
>please send me the details
Answers
Answer:
In 2017 Raiganj (Uttar Dinajpur) was experienced a dismal flood due to massive rainfall at the Mahananda river basin area. Because of this pungent rainfall, there was an excessive water flow in the Kulik River (Main River of Raiganj C.D. Block).
The water carrying capacity of the Kulik River was not enough to carry the excessive water and as a result, the river was overflowed by the water. Water spreads over the floodplain areas as well as in Raiganj and was created flooding like conditions in urban areas. Actually, Urban Flood is caused by the blockage of water in an urban region and there is no alternative way to pass the blockage water from the city. Due to this destructive flood a vast area of Raiganj block was trashy affected, such as part of Bhatun, part of Jagadishpur, Part of Mahipur, Part of Bindole, part of Sherur and part of Subhashganj and another hand ward no 3, 11, 13, 18, 16, and 22 badly affected due to this flood of Raiganj Municipality region. Poor maintenance of drainage system, unplanned development, Excessive rainfall, Unhealthy growth in human settlements, etc is the reasons for that type of Flooding. The destruction that was caused by the flood was very much pungent and tormenting. There are some remedial to avoid or reduced such types of destruction caused by floods, such as Reforestation, Making Concrete Dams or barrage, Time to time management of river barrages, etc.