Sumit can do a piece of work in 10 day Veenu can do a piece of work in 15 day . Then both will do the work together in how many day?
Answers
Answer:
A finishes the work in 10 days. B finishes the same work in 15 days. Together they can finish in how many days?
Though everybody here has given correct answer. I, would only like to introduce you to the approach which you can follow to solve such questions everytime you see them.:)
Method 1:
Firstly, you can assume a number and assign it to the amount of work needed to be completed. The best way to assume the number is to take the LCM of no. Of days which both A and B are taking.
Here, you can take the LCM of 15 and 10. Which is 30.
Now, this 30 is the amount of work which is required to be completed.
Now, if A is completing it in 10 days, which means, he is doing 3 units of work everyday.
Similarly, B is doing 2 units of work everyday to complete it in 15 days.
So, if they will work together, they will complete 3+2=5 units of work everyday.
Now, assume they complete the work in x days.
So, x*5=30->x=6
Therefore, the answer is 6 days.
Q.E.D.:-)
Method 2-
Since A is completing the work in 10 days, so in one day, he would be doing 1/10th of the total work.
Similarly, B would be doing 1/15th of the total work in 1 day.
Now if both of them unite, they will do (1/15+1/10)the of the total work in one day.
Which is 5/30 or 1/6
So, in one day, they are doing 1/6th of the total work.
Hence, to complete the work, they require 6 days.
just reciprocate the final answer after adding both the terms of you are still confused )
Step-by-step explanation:
Mark as the brainliest answer