Survey has to be done across the water channel. Prescribe the method to be used for doing leveling in such condition. Explain the method in detail with appropriate diagrams.
BTECH
PLEASE ANS As SOon as Possible
Answers
Answer:
Control surveying : To establish horizontal and vertical positions of control points. Land surveying : To determine the boundaries and areas of parcels of land, also known as property survey, boundary survey or cadastral survey.
Explanation:
The 7 most common survey methods are online surveys, in-person interviews, focus groups, panel sampling, telephone surveys, mail-in surveys, and kiosk surveys
Answer:
As man’s need to use and measure water has increased, a number of different and varied methods have been developed to measure the flow of water in open channels. Open channels are those natural and man-made structures through which water flows with a free surface.
Examples of such structures include streams, rivers, irrigation ditches, canals, partially full pipes, and water conveyance flumes.
Some of the more common methods currently in use to measure open channel flows are:
- Timed Gravimetric
- Tracer-Dilution
- Area-Velocity
- Manning’s Equation / (Gauckler-Manning-Strickler Formula)
- Hydraulic Structures (Flumes & Weirs)
Explanation:
bro the detailed answer is given in the link
( https://www.openchannelflow.com/blog/methods-of-measuring-flows-in-open-channels. )
it will help you