Answer:
6 hrs
Step-by-step explanation:
Time is taken by A to fill a tank = 4 hours
While a leak (1/4)th of the height of the tank from the bottom can empty = 2 hours
Calculation:
Time is taken by B to empty tank (3/4)th part = 2 hours
⇒ The efficiency of B = (3/4)/2 = 3/8
∴ Combined efficiency = (1/4) - (3/8) = -1/8 (Negative sign shows leak in the pipe)
⇒ Time required by both pipes to empty (3/4)th of a tank = (3/4)/(1/8)
⇒ Time required by both pipes to empty (3/4)th of a tank = 24/4 = 6
∴ The required answer is 6 hours