Answer:
Given:
cost of leveling the plot =6000
cost of leveling per m²=3
area of the plot =6000/3=2000 m²
length of the plot=80 m
length×breadth=2000
80×breadth=2000
breadth of the plot=2000/80=25 m
we know that, perimeter of a rectangular plot=2(length+breadth)
=2(80+25)
=2(105)
=210 m