Physics, asked by shwetadaga1984, 9 months ago

The blocks laid on the footpath have a small gap between them. Why?​

Answers

Answered by queency28
1

Answer:

Asphalt pavements are laid in long strips (several miles/kms is typical for highways), generally the width of the lane being paved. An adhesive is usually added along this “cold joint” to help the new pavement adhere to the existing material. This adhesive can degrade over time.

Explanation:

pls mark as brainliest answer

Similar questions