The Concrete work for the following part of the building of specified thickness is measured in square meters
Answers
The concrete work for the following part of the building of specified thickness is measured in square meters
A. Root slabs
B. Floors
C. Wall panels
D. All the above
Answer: Option D
Answer: 4) All of the above
Step-by-step explanation:
Q)The concrete work for the following part of the building of specified thickness is measured in square meters
- Root slabs
- Floors
- Wall panels
- All the above
The answer to the above question is 4)All of the above
Works consist of areal surface measurements which involve area like shuttering, plastering, whitewashing, partitions of specified thickness, Formworks, Concrete Jeffries, Damp proof course, concrete work of specified thickness, etc. are expressed in square meters (m2).
Concrete works of specified thickness are measured in square meters as it involves area.
Works that consist of cubical contents which involve volume like earthwork, cement concrete work e.g. R.C. Chhajja, Masonry, etc. are expressed in Cubic meters (m3).
Works that consist of linear measurements and involve length like cornice, fencing, handrail, bands of specified width, etc., are expressed in running meters (m).
Single units work like doors, windows, trusses, etc. are expressed in numbers.