The construction of big dams in the river valley projects are considered to play a key role in the development process. Explain.
Answers
Explanation:
. The Government is considering a multi-purpose river valley project
in which would involve construction of a dam, a reservoir, a power house, and several irrigation canals. The project would supply water for irrigation, generate electricity, and provide a measure of protection against floods. The following information has been gathered by the project control board.
The project will require the following during the construction stage:
i) locally produced power equipment costing Ks 200 million;
ii) imported power equipment costing $ 10 million;
iii) 20,000 tonnes of steel produced locally and made available to the project at Ks 6000 a tonne;
iv) 350,000 tonnes of cement produced locally and made available to the project at Ks 800 a tonne;
v) other construction materials (sand, bricks, ballast, etc.) costing Ks 100 million;