Social Sciences, asked by rb3080509, 10 months ago


The construction of Damodar river project has resulted in ​

Answers

Answered by priyakumari000000
0

Answer:

The Damodar Valley Project was carried out with an aim to control flood along the Damodar River Basin and also to eliminate other problems. 1) Irrigation facilities have been provided in those areas. 2) Soil erosion has been checked through regulated flow of water.

Answered by KRPS500
9

The Damodar Valley Project was carried out with an aim to control flood along the Damodar River Basin and also to eliminate other problems. 1) Irrigation facilities have been provided in those areas. 2) Soil erosion has been checked through regulated flow of water.

Explanation:

give me a 20 thanks I will give you 3 followers my old id

 <marquee \: behavior = alternate><font \: color =green> MARK BRILLIANT

Similar questions