Math, asked by abhinayaabhi9608, 1 year ago

The cost if fencing a circular field at the rate of rs.24per meter is rs5280.The field is to be ploughed at the rate of rs.0.50per m2find the cost of ploughing the field

Answers

Answered by vaibhav4329
6
perimeter of circular field = total cost of fencing / rate of fencing
=5280/24 =220 m
now 2pi r = 220 m
r = 220×7/44
therefore r = 35 m
area of the field =
\pi \: r {}^{2}
=
22/7 × 35 ×35 =3850 m2

Similar questions